Proinelca Power closed with ACCIONA a contract to carry out the engineering, manufacturing and commissioning of the control system, SCADA, protection system, synchronization and measurement, etc., of the “BCS-V internal combustion plant (1 x 46MW + 1 x 2.5MW) and 230kV substation” in Mexico.